Vidyasagar Sreedhar

Vidyasagar Sreedhar

Goes by VS

I ran the model before I ran the job.

Senior Project Manager in BIM/VDC in Sacramento. I came up through detailing and coordination, so when I put a number or a duration on something, it comes from having built it that way myself.

[email protected] +1 510 963 0345 linkedin ↗ Résumé PDF
8+ Years in BIM/VDC
6 Roles, one employer
8 Peak concurrent jobs
53% Peak profit margin
15 Largest team led
01

Marquee projects

Government · Design-build · Sacramento

State Capitol Annex

Design-build, so the model led the design instead of following it. I led BIM/VDC delivery on a large electrical scope with a team that peaked at 15: coordination, modeling, shop and prefabrication drawings, from underground utilities through commissioning.

53% profit margin — above benchmark

Civic · Design-build · GMP · Sacramento

Superior Courthouse

Design-build under a guaranteed maximum price, so every hour of rework came straight out of the margin. A little over 30 months with 12 people: I led the team, handled the client, and ran estimation and bid strategy alongside the BIM coordination.

38% profit margin — above benchmark

Healthcare · IFOA · Sacramento

Sutter Health, J Street

An IFOA contract, so risk and reward are shared across the project team and coordination calls get made together instead of traded. I handle client relations and own the financial and schedule side.

In progress · Late 2025 –

Life sciences · Design-build · Foster City

Gilead Sciences facility

Another design-build job, where the model leads the design instead of following it. I carry this one alongside the healthcare work and oversee coordination across teams on a tight schedule.

In progress · Late 2025 –

02

Progression · Sanveo, Inc.

2018 → present

Senior Project Manager

Portfolio ownership across healthcare, life sciences, and civic 2024 —

Project Manager

Capitol Annex electrical scope, team of 15 2023 — 24

Assistant Project Manager

First full P&L: the Courthouse, start to finish 2022 — 23

Senior Project Engineer

Schedule, budget, and RFIs on a two-year build 2021 — 22

BIM Construction Engineer

Revit modeling, Navisworks coordination, 3 detailers 2018 — 21

Intern

QA/QC on models and markups, clash review 2018

Full dates, scope, and metrics are in the résumé PDF.

03

How I work

Leading the job

I ran a team of 15 on the Capitol Annex because the scope needed it, and later flattened the structure when the extra layers weren't paying for themselves. I size a team to the work in front of it. I also tell clients what the schedule is actually telling me, which isn't always what they want to hear.

Multi-project portfolio oversight · Stakeholder management · Financial & schedule accountability

Documents

I read the contract drawings and specs closely. When something doesn't line up I get an RFI out early, while there's still time for a real answer, and I go through submittals for anomalies before anything reaches the field. A problem found on paper is cheap. The same problem found in the ceiling isn't.

RFI preparation & management · Submittal review · QA/QC

Technical depth

I've worked every role below this one, starting with QA/QC on markups and moving into modeling and coordinating full electrical scope. That's what my estimates are built on. I know which method fits the scope, what it takes to build, and how long it really takes.

Autodesk Revit · Navisworks Manage · Revizto

Automation

I don't like watching people grind through repetitive modeling. If there's a smarter way I'll go find it, usually with colleagues who know Dynamo better than I do, and it takes a serious bite out of the manual hours. The team gets to spend that time on work that needs a person thinking.

Dynamo-assisted workflows · Model automation · Cross-team collaboration

Training & knowledge transfer

I train my teams on constructability, accessibility clearances, seismic requirements and the rest of the QA/QC checklist, and I write the standards down as we go. Otherwise it all leaves with whoever learned it.

Constructability · Accessibility · Seismic · QA/QC standards & documentation

Where margin comes from

Most of the profit on a job is decided before anyone installs anything. Clashes resolved in the model, prefab drawings the field crew can build straight from, coordination closed out before the schedule gets tight.

Clash detection · Prefabrication & shop drawings · Electrical trade coordination

SectorsHealthcare · Life sciences · Government & civic · Correctional · Commercial office
CertifiedOSHA 30-Hour · LEED Green Associate
04

War stories

2022 · Superior Courthouse

Running the Courthouse through the pandemic

Half the team went remote in a week and the field kept working. It was my first job with full P&L on it, 12 people and 30-odd months, and we held coordination together well enough to finish at a 38% margin. Most of what saved it was just staying in constant contact with people.

2023 · Capitol Annex

Fifteen people, one electrical scope

Design-build, so the model was leading the design rather than chasing it, and coordination had to stay ahead of everybody. We ran a team of 15 from underground utilities through commissioning and finished at a 53% margin. Most of that was won months earlier, in coordination.

05

Education

MS, Construction Management

California State University, East Bay

2018

BE, Civil Engineering

Visvesvaraya Technological University

2015

Open to VDC leadership roles in the Sacramento region.

If something in your VDC process isn't working, whether that's coordination, prefab, documentation or training, I'd be glad to hear about it and talk through where I could help.

[email protected] +1 510 963 0345 ↗ linkedin ↗